• About
  • Services
  • Recent Projects
  • Blog
  • Contact
book a consultation
  • About
  • Services
  • Recent Projects
  • Blog
  • Contact
book a consultation
17. GD&T as a Communication System, Not a Drawing Requirement

17. GD&T as a Communication System, Not a Drawing Requirement

by Steve Donnigan | Sep 10, 2026 | Design & Development, Medical Device

Drawings Alone Do Not Create Alignment Geometric Dimensioning and Tolerancing (GD&T) is often introduced as a drafting standard tied to manufacturing drawings. In many organizations, GD&T enters the conversation late in development, when drawings are nearing...
16. Why Executive Dashboards Rarely Show Real Risk

16. Why Executive Dashboards Rarely Show Real Risk

by Steve Donnigan | May 26, 2026 | Regulatory & Risk Management

The “Green Program” That Wasn’t Three months before formal verification, the program review looked exactly as leadership would hope. Every major workstream was green. Milestones were holding. No critical issues were open. The dashboard signaled control. The first full...
15. Design for Manufacturing Is a Quality Exercise, Not a Cost Exercise

15. Design for Manufacturing Is a Quality Exercise, Not a Cost Exercise

by Steve Donnigan | May 22, 2026 | Manufacturing & Quality

The Common Approach Design for Manufacturing is often introduced as a cost reduction activity. It shows up when margins tighten, when sourcing changes, or when a program is already under pressure. At that point, teams look for ways to make the product cheaper to...
14. Verification Is a System, Not a Phase

14. Verification Is a System, Not a Phase

by Steve Donnigan | May 8, 2026 | Verification & Testing

When Treated as a Phase, Verification Is Undervalued Most development teams treat verification as something that happens near the end of a program. It is planned, scheduled, and executed as a step to confirm that the design meets requirements. In that model,...
13. How to Tell If Your Verification Plan Will Fail (Before Testing Begins)

13. How to Tell If Your Verification Plan Will Fail (Before Testing Begins)

by Steve Donnigan | May 1, 2026 | Verification & Testing

Verification failures are rarely surprises. When a test fails late in development, teams often treat it as an execution issue. Attention shifts to the method, the setup, or the result itself. In most cases, the underlying problem was introduced much earlier. Many...
« Older Entries

Recent Posts

  • 17. GD&T as a Communication System, Not a Drawing Requirement
  • 16. Why Executive Dashboards Rarely Show Real Risk
  • 15. Design for Manufacturing Is a Quality Exercise, Not a Cost Exercise
  • 14. Verification Is a System, Not a Phase
  • 13. How to Tell If Your Verification Plan Will Fail (Before Testing Begins)

Recent Comments

No comments to show.

Navigation

Home
About
Services
Recent Projects
Blog
Contact
Contact

sdonnigan@a65consulting.com

303-880-3350

  • Follow

2026 © All rights reserved by A65 Consulting, LLC