• About
  • Services
  • Recent Projects
  • Blog
  • Contact
book a consultation
  • About
  • Services
  • Recent Projects
  • Blog
  • Contact
book a consultation
16. Why Executive Dashboards Rarely Show Real Risk

16. Why Executive Dashboards Rarely Show Real Risk

by Steve Donnigan | May 26, 2026 | Regulatory & Risk Management

The “Green Program” That Wasn’t Three months before formal verification, the program review looked exactly as leadership would hope. Every major workstream was green. Milestones were holding. No critical issues were open. The dashboard signaled control. The first full...
15. Design for Manufacturing Is a Quality Exercise, Not a Cost Exercise

15. Design for Manufacturing Is a Quality Exercise, Not a Cost Exercise

by Steve Donnigan | May 22, 2026 | Manufacturing & Quality

The Common Approach Design for Manufacturing is often introduced as a cost reduction activity. It shows up when margins tighten, when sourcing changes, or when a program is already under pressure. At that point, teams look for ways to make the product cheaper to...
14. Verification Is a System, Not a Phase

14. Verification Is a System, Not a Phase

by Steve Donnigan | May 8, 2026 | Verification & Testing

When Treated as a Phase, Verification Is Undervalued Most development teams treat verification as something that happens near the end of a program. It is planned, scheduled, and executed as a step to confirm that the design meets requirements. In that model,...
13. How to Tell If Your Verification Plan Will Fail (Before Testing Begins)

13. How to Tell If Your Verification Plan Will Fail (Before Testing Begins)

by Steve Donnigan | May 1, 2026 | Verification & Testing

Verification failures are rarely surprises. When a test fails late in development, teams often treat it as an execution issue. Attention shifts to the method, the setup, or the result itself. In most cases, the underlying problem was introduced much earlier. Many...
12. When Engineering Outsourcing Accelerates Development — and When It Slows It Down

12. When Engineering Outsourcing Accelerates Development — and When It Slows It Down

by Steve Donnigan | Apr 24, 2026 | Engineering Leadership & Outsourcing

Outsourcing is often presented as a straightforward way to move faster. If a program needs more speed, add external resources. If specialized expertise is missing, bring in a partner. If timelines are tight, increase capacity. Sometimes this works exactly as intended....
« Older Entries

Recent Posts

  • 16. Why Executive Dashboards Rarely Show Real Risk
  • 15. Design for Manufacturing Is a Quality Exercise, Not a Cost Exercise
  • 14. Verification Is a System, Not a Phase
  • 13. How to Tell If Your Verification Plan Will Fail (Before Testing Begins)
  • 12. When Engineering Outsourcing Accelerates Development — and When It Slows It Down

Recent Comments

No comments to show.

Navigation

Home
About
Services
Recent Projects
Blog
Contact
Contact

sdonnigan@a65consulting.com

303-880-3350

  • Follow

2026 © All rights reserved by A65 Consulting, LLC